Guodian Yuyang Coal and Electricity Integration Co., Ltd. #1 unit A-level maintenance supervision tender [secondary connection] tender notice

Chapter 1 ${Tender Notice/Bid Invitation}

Project Name: Guodian Xiangyang Coal and Electricity Integration Co., Ltd. #1 Unit A Class Maintenance Inspection Bidding [Secondary Linkage] (hereinafter referred to as "Project")
Bidding number: GDCX01-JGZB17-1746
Date: December 14, 2017
1.2 Bidding conditions
The tender project (Guoyang Coal and Electricity Integration Co., Ltd. #1 unit A-level maintenance supervision tender) has been approved for construction, the project company is Guoyang Xiangyang Coal and Electricity Integration Co., Ltd., the construction fund comes from self-raising, and the bidder is Guoyang Liyang Coal and Electricity. Chemical Co., Ltd. The project has already met the conditions for bidding and the project supervision is now open for public bidding.
1.3 Project Overview and Bidding Scope
The company is located in No. 1 Guodian Avenue, Liyang City, Henan Province. Guodian Xiangyang Coal and Electricity Integration Co., Ltd. Phase I project is a 2×630MW “W” flame supercritical coal-fired generating unit. The current phase of the project was jointly established and operated by China Guodian Corporation and Hebi Group. Both parties contributed 80% and 20% respectively. Phase 1 projects #1 and #2 were put into trial production on November 13, 2010 and 168 hours on November 29, 2010 respectively. At present, the routine inspection and maintenance work for boilers and ash removal for #1 and #2 units is under the responsibility of Zhengzhou Xinli Electric Power Co., Ltd., and the daily inspection and maintenance of desulphurization is performed by Guodian Longyuan Company. Turbine and water are used for #1 and #2 units. The routine maintenance and repair work of the system is the responsibility of Zhengzhou Xinli Electric Power Co., Ltd., and daily maintenance and repair work of the coal conveying system is handled by Zhengzhou Xinli Electric Power Co., Ltd. The scope of supervision of this project is overhaul and overhaul of #1 unit of Guodian Xiangyang Coal and Electricity Integration Co., Ltd., including standard projects, non-standard projects and all technical renovation projects, etc.
1.4 Eligibility Requirements for Qualified Bidders
1.4.1 Bidder qualification and performance requirements (if the requirements of other parts of the bidding documents are inconsistent, this article shall prevail).
No. Title Title Bidder Qualification and Performance Requirements
1 Class 1 Maintenance Supervision for Unit #1 1. The bidder must have a comprehensive qualification for supervision or a Class A qualification certificate for power engineering supervision.
2. The bidder must have at least two over 600MW and above capacity thermal power unit overhaul repair supervision performance in the past five years.
Performance recognition principle: performance is based on the contract
1.4.2 The Bidder did not have a status listed as a defaulted trustee during the evaluation of the project. The bidder was specifically identified as the National Court of Default, the Information on the List of Executable Persons, and the National Development Reform (shixin.court.gov.cn). Committee Credit China () website search results prevail.
1.6 Selling Bidding Documents:

Hot Products List

Film capacitors are electrical capacitors with an insulating plastic film as the dielectric, sometimes combined with paper as carrier of the electrodes. These plastic films are sometimes metalized and are available in the market under the name metalized Film Capacitor,these capacitors are sometimes also called plastic capacitors.

Film Capacitor, X-Ray equipment Capacitor, Axial Polyester Capacitor, Polypropylene High Voltage Capacitor

XIAN STATE IMPORT & EXPORT CORP. , https://www.shvcomponents.com